| ปี พ.ศ. 2557 |
| 1 |
Comparison of life cycle costing and economic benefits of different wayside lubrication technology in heavy haul railway |
| 2 |
Development of effective performance measures for wayside rail curve lubrication in heavy haul lines |
| 3 |
Research methodology for evaluation of top-of-rail friction management in Australian heavy haul networks |
| ปี พ.ศ. 2556 |
| 4 |
Research Methodology for Evaluation of Top of Rail Friction Management in Australian Heavy Haul Networks |
| 5 |
Development of a unified railway track stability management tool to enhance track safety |
| 6 |
An Australian railway bridge management framework |
| 7 |
Life Cycle Cost Estimation for Railway Bridge Maintenance |
| 8 |
Life cycle management for railway bridge assets |
| 9 |
RCF Quantification towards rail grinding best practices for Australian heavy haul rail / |
| ปี พ.ศ. 2555 |
| 10 |
Life cycle management of railway bridges : defect management |
| 11 |
Modelling of grease transport mechanism in wayside rail lubrication and impact of related parameters |
| 12 |
Modelling manufacturers' and customers' costs for cost sharing lifetime warranty. |
| ปี พ.ศ. 2554 |
| 13 |
Conference on asset and maintenance management (CAMM) 2011 |
| 14 |
A decision model for analysing the effectiveness of powerline maintenance teams |
| 15 |
Experimental setup and methodology for the analysis of rail lubricant effectiveness |
| 16 |
Economic modelling for preventive grinding to support grinding decisions for heavy haul lines |
| 17 |
Life cycle cost model for circuit breakers in electricity transmission utilities |
| 18 |
Development of economic model for analyzing lubrication effectiveness in heavy haul lines |
| 19 |
Improvement of rail creep data to measure the stress state of a tangent continuously welded rail (CWR) track |
| 20 |
Proposed Australian Rail Bridge Management Framework |
| 21 |
Friction management best practices for Australian heavy haul lines |
| 22 |
Integrating work and learning in a postgraduate maintenance management program |
| ปี พ.ศ. 2553 |
| 23 |
Modelling cost of maintenance contract for rail infrastructure |
| 24 |
Gap analysis for asset condition monitoring |
| 25 |
Rail grinding quality assurance based on profile correction and RCF control |
| 26 |
Wayside lubricator placement model for heavy haul lines in Australia |
| 27 |
Remote condition monitoring and control of wayside rail lubricators |
| 28 |
Determination of risks to manufacturer and buyers for lifetime warranty policies by considering uncertainties of lifetime |
| 29 |
Performance measures for achieving asset productivity improvement |
| 30 |
Work integrated blended learning for improvement by asset managers |
| 31 |
Cost-effective solution for detection of leaky food packaging seals using innovative non-contact testing |
| 32 |
Modelling risks to manufacturer and buyer for lifetime warranty policies |
| 33 |
Modelling total cost of ownership of rail infrastructure for outsourcing maintenance services |
| 34 |
Best practice in rail curve lubrication and remote performance monitoring in heavy haul lines |
| ปี พ.ศ. 2552 |
| 35 |
Studies on the impact of learning and unlearning on asset management |
| 36 |
Development of a cost benefit model for best practice rail grinding combining above rail and below rail assets |
| 37 |
On-line non-intrusive condition monitoring of high voltage equipment : a review |
| 38 |
Development of a quantitative model for decision making in sustainable development (SD) |
| 39 |
Development of economic model for analysing lubrication effectiveness based on below rail and above rail assets |
| 40 |
Modelling for pre and post grinding inspections in heavy haul lines |
| 41 |
Comparative study of track buckling parameters of continuous welded rail |
| 42 |
Modelling business process and application of condition monitoring in the utility services sector |
| 43 |
Parameter estimation for rail degradation model |
| 44 |
Quantitative approach to risk based maintenance decisions |
| 45 |
Determination of the price for free repair warranty policy for a second-hand product with considering the buyer’s risk attitude |
| 46 |
Space-time value stream model in sustainable development |
| 47 |
Decision support system (DSS) for rail maintenance in heavy haul line |
| 48 |
High-speed sensing and detection system for automatic removal of packages with seal quality issues from a food packaging line |
| 49 |
Applicability of six sigma for asset management |
| 50 |
Modelling quality of life for sustainable development |
| ปี พ.ศ. 2551 |
| 51 |
Application of performance measure frameworks for improving asset utilisation |
| 52 |
An integrated approach to rail maintenance decisions |
| 53 |
Six Sigma as a continual improvement tool for asset management |
| 54 |
Integrated framework for multi criteria hierarchical performance measure for management of power transmission assets |
| 55 |
Railway rollingstock degradation models |
| 56 |
Cost estimation for maintenance contracts for complex asset/equipment |
| 57 |
Challenges of asset management in power transmission network |
| 58 |
Integrated model for sustainable development |
| 59 |
Evaluation of technical Vs economic decisions in rail grinding |
| ปี พ.ศ. 2550 |
| 60 |
Development of integrated model for assessment of operational risks in rail track |
| 61 |
Sensitivity of manufacturer and buyer’s risks for lifetime warranty policies |
| 62 |
Optimal service contract policies for outsourcing maintenance service of assets to the service providers |
| 63 |
Modelling and analysis of rail maintenance cost |
| 64 |
Modeling total cost of ownership of rail infrastructure for outsourcing services |
| 65 |
Analysis of cycle time variation for process optimization in animal feed block plant |
| 66 |
Soil factors behind inground decay of timber |
| 67 |
Reliability improvement through alternative designs |
| 68 |
Study and analysis of risks at railway level crossings |
| 69 |
Modelling cost sharing policies for lifetime warranty |
| 70 |
Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM) |
| 71 |
Application of systems approach to process improvement |
| 72 |
Six-sigma methodology for maintenance performance improvement |
| 73 |
Cost-benefit model for rail inspection decision using limited and incomplete data |
| 74 |
Development of lifetime warranty policies and models for estimating costs |
| ปี พ.ศ. 2549 |
| 75 |
Analysis of field data to develop rail wear prediction model |
| 76 |
Modeling and analysis of warranty cost for 2D-policies associated with sale of second-hand products |
| 77 |
Analysis of rail wear data for evaluation of lubrication performance |
| ปี พ.ศ. 2548 |
| 78 |
Decision on economical rail grinding interval for controlling rolling contact fatigue |
| ปี พ.ศ. 2547 |
| 79 |
Optimal reliability improvement for used items sold with warranty |