ridm@nrct.go.th   ระบบคลังข้อมูลงานวิจัยไทย   รายการโปรดที่คุณเลือกไว้

Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine

หน่วยงาน Central Queensland University, Australia

รายละเอียด

ชื่อเรื่อง : Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine
นักวิจัย : Houley, Levi. , Alahakoon, Sanath.
คำค้น : LIBRARY OF CONGRESS NEEDED , 850603 Energy Systems Analysis. , 850703 Industrial Energy Conservation and Efficiency. , 090401 Carbon Capture Engineering (excl. Sequestration). , 090607 Power and Energy Systems Engineering (excl. Renewable Power). , 090407 Process Control and Simulation. , Rope shovel -- Load flow -- Fault -- Protection -- Harmonic -- Arc flash , Conference Paper. Full Paper (Refereed)
หน่วยงาน : Central Queensland University, Australia
ผู้ร่วมงาน : -
ปีพิมพ์ : 2555
อ้างอิง : https://www.engineersaustralia.org.au/sites/default/files/shado/Divisions/Queensland%20Division/Events/2012/proceedings_1.pdf , http://hdl.cqu.edu.au/10018/938071
ที่มา : Houley, A & Alahakoon, S 2012, 'Impact Assessment of Electric Rope Shovels on The Distribution System of Rio Tinto’s Hail Creek Mine', paper presented to the Central Region Engineering Conference, Central Queensland University, Rockhampton, Queensland, 10th-11th August, https://www.engineersaustralia.org.au/sites/default/files/shado/Divisions/Queensland%20Division/Events/2012/proceedings_1.pdf
ความเชี่ยวชาญ : -
ความสัมพันธ์ : Central Region Engineering Conference 2012 proceedings,10-11 August, 2012, Rockhampton, Queensland. Rockhampton, Queensland : Engineers Australia, 2012. p. 19-22 4 pages Refereed , ACQUIRE [electronic resource] : Central Queensland University Institutional Repository.
ขอบเขตของเนื้อหา : -
บทคัดย่อ/คำอธิบาย :

Rio Tinto’s Hail Creek Mine recently purchased a P&H 4100XPC AC electric rope shovel, the first of its kind to be commissioned in Australia. Hail Creek Mine already possessed a P&H 4100XPC DC electric rope shovel that had been in operation for approximately two years. To date there had been little work done on evaluating the operation of the 4100DC electric rope shovel, and no work had been done into investigating the intended operation of the 4100AC shovel. The aim of this paper is to investigate the effects of the 4100XPC AC and DC electric rope shovels on Hail Creek Mine’s distribution system through the use of the SKM PowerToolsTM modeling software. This paper outlines the modeling process used to simulate the operation of both electric rope shovels as well as the standards that were used to determine if the shovels’ impact on the distribution system was within acceptable limits. Load flow, fault, protection co-ordination, harmonic and arc flash studies were conducted and it was found that the existing DC shovel connection arrangement and proposed AC shovel arrangement did not have a negative impact on the mine site’s distribution network.

บรรณานุกรม :
Houley, Levi. , Alahakoon, Sanath. . (2555). Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine.
    กรุงเทพมหานคร : Central Queensland University, Australia.
Houley, Levi. , Alahakoon, Sanath. . 2555. "Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine".
    กรุงเทพมหานคร : Central Queensland University, Australia.
Houley, Levi. , Alahakoon, Sanath. . "Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine."
    กรุงเทพมหานคร : Central Queensland University, Australia, 2555. Print.
Houley, Levi. , Alahakoon, Sanath. . Impact assessment of electric rope shovels on the distribution system of Rio Tinto’s Hail Creek Mine. กรุงเทพมหานคร : Central Queensland University, Australia; 2555.