| ชื่อเรื่อง | : | Short-term and medium-term reliability evaluation for power systems with high penetration of wind power |
| นักวิจัย | : | Ding, Yi , Singh, Chanan , Goel, Lalit , Ostergaard, Jacob , Wang, Peng |
| คำค้น | : | DRNTU::Engineering::Electrical and electronic engineering::Electronic systems , DRNTU::Engineering::Electrical and electronic engineering::Electric power |
| หน่วยงาน | : | Nanyang Technological University, Singapore |
| ผู้ร่วมงาน | : | - |
| ปีพิมพ์ | : | 2557 |
| อ้างอิง | : | Ding, Y., Singh, C., Goel, L., Ostergaard, J., & Wang, P. (2014). Short-term and medium-term reliability evaluation for power systems with high penetration of wind power. IEEE transactions on sustainable energy, 5(3), 896-906. , 1949-3029 , http://hdl.handle.net/10220/24159 , http://dx.doi.org/10.1109/TSTE.2014.2313017 |
| ที่มา | : | - |
| ความเชี่ยวชาญ | : | - |
| ความสัมพันธ์ | : | IEEE transactions on sustainable energy |
| ขอบเขตของเนื้อหา | : | - |
| บทคัดย่อ/คำอธิบาย | : | The expanding share of the fluctuating and less predictable wind power generation can introduce complexities in power system reliability evaluation and management. This entails a need for the system operator to assess the system status more accurately for securing real-time balancing. The existing reliability evaluation techniques for power systems are well developed. These techniques are more focused on steady-state (time-independent) reliability evaluation and have been successfully applied in power system planning and expansion. In the operational phase, however, they may be too rough an approximation of the time-varying behavior of power systems with high penetration of wind power. This paper proposes a time-varying reliability assessment technique. Time-varying reliability models for wind farms, conventional generating units, and rapid start-up generating units are developed and represented as the corresponding universal generating functions (UGFs), respectively. A multistate model for a hybrid generation and reserve provider is also proposed based on the developed UGF representations of wind farms, conventional generating units, and rapid start-up generating units. The proposed technique provides a useful tool for the system operator to evaluate the reliability and arrange reserve for maintaining secure system operation in the short- as well as medium-terms. |
| บรรณานุกรม | : |
Ding, Yi , Singh, Chanan , Goel, Lalit , Ostergaard, Jacob , Wang, Peng . (2557). Short-term and medium-term reliability evaluation for power systems with high penetration of wind power.
กรุงเทพมหานคร : Nanyang Technological University, Singapore. Ding, Yi , Singh, Chanan , Goel, Lalit , Ostergaard, Jacob , Wang, Peng . 2557. "Short-term and medium-term reliability evaluation for power systems with high penetration of wind power".
กรุงเทพมหานคร : Nanyang Technological University, Singapore. Ding, Yi , Singh, Chanan , Goel, Lalit , Ostergaard, Jacob , Wang, Peng . "Short-term and medium-term reliability evaluation for power systems with high penetration of wind power."
กรุงเทพมหานคร : Nanyang Technological University, Singapore, 2557. Print. Ding, Yi , Singh, Chanan , Goel, Lalit , Ostergaard, Jacob , Wang, Peng . Short-term and medium-term reliability evaluation for power systems with high penetration of wind power. กรุงเทพมหานคร : Nanyang Technological University, Singapore; 2557.
|
